3 test functions, 4 snmp function – PATLITE NHL User Manual
Page 23
![background image](/manuals/373122/23/background.png)
23
3
3.3 Test Functions
The test function does a sequential check of the Signal Tower and buzzer, as well as checking other
operations. The test operation lights up the tower lights and buzzer every second in steps; in the order of red,
yellow, green, blue, white, and buzzer. When only a three-tiered Signal Tower is in use, a time delay between
the third tier and buzzer sound will occur. Stopping the test operation can be performed 7 seconds after
execution, when the buzzer test is complete (it takes about 1 second).
[Test Function Starting Method]
• When the Test Button is Depressed
• When the "test" or "dotest" Commands are Received by the RSH
[Test Function Stopping Method]
• When the CLEAR Switch is Depressed
• When the RSH receives a "Clear" or "Doclear" Command
• From an SNMP "Clear" Command
• From the Web Setup Tool of the Signal Tower Operation Screen
• From a PNS Command sending a Clear Command Transmission
Fig. 4.3.1 Detailed View of Test Operation
3.4 SNMP Function
This product can control the Signal Tower, and acquisition the status and TRAP reception using the SNMP
functions. For customers who purchased this product, Please download the MIB file for use with the SNMP
functions. Furthermore, for details on the setting method of this product, refer to “4.4 SNMP Setting Screen”.
During the test operation, this product stops receiving everything else except the Ping
monitoring application.
Please
0
1
3
4
5
7 ....
Signal Tower Red
Signal Tower Amber
Signal Tower Green
Signal Tower Blue
Signal Tower Clear
Buzzer Sound Pattern1
Time (sec)
6
2