3 power supply input, 4 lan connection – PATLITE NHL User Manual
Page 17
17
2
2.3 Power Supply Input
Attach the power plug for this product in accordance with the figure below. This product requires at least 30
seconds for the boot-up sequence to complete.
[Power Plug Mounting Instruction]
1. Remove the clamp for the power cable.
2. Pass the power cable through the clamp.
3. Insert the power plug into this product.
4. Screw the clamp down to tighten it, and ensure enough slack (about 15mm) has been given to the power
cable.
5. When power is supplied to this product, the lights will all turn on for about 1 second.
Fig. 2.3.1 Power Cable Mounting Diagram
2.4 LAN Connection
Connect the LAN cable to this product. Use either a catagory 5 LAN cable, or twisted-pair cable (UTP or
STP) for this application.
Installation Example 3: Permanent Surface Installation (screw-support base)
[Installation]
1. Drill holes with a diameter of 4.5mm onto a flat
surface to install.
2. Affix the Support Base accessory to this product.
※ Please do not attach the rubber feet or adhesive
seals when clamping the Support Base with screws.
3. Use an M4 screw (or M4 bolt, etc.) to attach the
Support Base onto the installation surface and
tighten it with M4 nuts.
125.5
1
0
0
8
4
74
4-
φ
4.5
• Periodically check whether dust builds up on the electric socket and clean it if dust builds up.
Ensure maintenance is performed to avoid dust build-up, because it may result in fire if too much
dust is allowed to build up.
• Do not touch the electric socket with wet hands. Failure to comply will result in electric shock.
Warning
RX/TX
LINK
24VDC
(15)mm
Location for
tapping 4.5mm
holes
Front Direction of Product