beautypg.com

3 ts-lld system operation & testing - 1, System operation - 1, 3ts-lld system operation & testing – Franklin Fueling Systems TS-LLD Installation Manual User Manual

Page 57

background image

System Operation & Testing

Page 3 - 1

3

3

TS-LLD System Operation & Testing

System Operation

The TS-LLD system can perform three different

pressurized line leak tests, two

of which run automatically. The automatic line leak tests are: a

gross

3.0 gph

hourly test, and a

standard

0.2 gph monthly-compliance test. The third test is a

precision

0.1 gph annual test that must be started manually at the control unit...

the 0.1 annual test is also known as a

manual test

.

A

Quick Reference Guide

is provided with every TS-LLD system. It was designed

specifically for use by your customer at his station. Inform your customer to keep
a log of all alarm and error codes. This log could be FAXed to you and would

prove to be very useful diagnostic tool.

Distributors and Installers: you may

order more guides by contacting

INCON and asking for part number 000-1447 or

for 000-1482, which is a color-laminated version. Certain restrictions may apply.

Need Help ?

Call INCON Technical Service

@

1-800-984-6266 (or FAX: 1-207-282-9002) for

help with leak alarms, or diagnostic codes. Also, please call if alarms, warnings,

or error codes occur frequently or repeatedly.

DANGER

This line leak detector may start the pump at any time during a line

leak test to maintain fuel line pressurize.

Avoid Fire, Explosion hazards, and

Electrical shock hazards... make sure that all dispenser and submersible

pump power is turned off / locked out before attempting any service (such as:

replacing fuel line filters).

Inspect the copper Mineral Insulated Cable (MI Cable)

at the Leak Sensing Unit for damage, kinks, or breakage. Make sure to do this

after any installation or service is done in the containment sump / pump head and

BEFORE power is applied. See Chapter.Section 2.2 in this manual about
installation and inspection.

Never apply power if the MI Cable is damaged !

Contents:

System Operation

Normal Displays (Day Counts, Diagnostic Codes)

Fault displays (Test fails, Monthly Compliance Warnings)

Indicator lights, RESET-TEST button USE

Starting a 0.1 Manual Precision Leak Test

Normal Operation (Sequence of Events)

Out of Compliance (Dispensing Disabled)

Frequently Asked Questions

What to do: When a Leak Test Fails ? (Leak is Detected)