Materials and Tools Required

Page 2.0 - 1

2.0

2.0

TS-LLD Materials & Tools

Required

Do a Site Survey Before Attempting the Installation

Submersible Turbine Pumps:

What is the Motor Control / Pump Relay Box or Starter Type ? and
What is the Model Number, HP, Manufacturer, and age of all Turbine Pumps ?

Electrical Supply:

What is the Voltage and Phase (240 VAC – Single or Three Phase ? ) of all
Turbine Pumps ?

Materials Required

Petroleum absorbent / absorbing rags

Pipe Dope — Non-hardening (Soft-Set), UL Classified, gas/oil resistant —

to seal the Leak Sensing Unit, and the 1/4 inch Tank Test Port plug at the pump

MI Cable Adapter — for installation on the TS-LLD Leak Sensing Unit (LSU). The

TS-RJ 2" NPT Cable Adapter for Red Jacket

®

submersible pumps is

(supplied

with the TS-LLD),

the adapter for FE Petro

®

STPs must be ordered separately...

Order INCON part number:

TS-FE 3" straight Cable Adapter for FE Petro

®

STPs

*

Stick-on

DANGER

labels

(INCON P/N 240-1175 – supplied with the TS-LLD)

(1) 1/4 inch NPT pipe plug for the tank test port at the pump head

(supplied with

the TS-LLD)

Red wire nuts for LSU wiring at the pump head

(supplied with the TS-LLD)

(1) 1µ Farad Line Filter capacitor for the pump relay box

(INCON P/N 020-0028

– supplied with the TS-LLD)

Wire: 14 AWG, 3 feet

(supplied with the TS-LLD)

(6) spade lugs for #8 studs to connect the 14 AWG wire at the pump relay box