Franklin Fueling Systems TS-LLD Installation Manual User Manual
Page 10

Components Included with Each TS-LLD System
(TS-LLD Packing List)
(1)
CU – Control Unit enclosure assembly (with stick-on CU Serial No. label)
(1)
CU – Control Unit faceplate cover assembly
*
– (4)
CU cover hold-down screws (4-40 x 1/4 inch)
(1)
Bundle of different colored wire (Wire Bundle)
*
– (1)
Spare 1/2 Micro Amp Fuse (F1)
*
– (1)
Line Filter Capacitor, 1 µ Farad (for pump relay / motor control box)
(1)
Sheet of (9) stick-on –
DANGER
labels
(1)
LSU – Leak Sensing Unit (with stick-on LSU Serial No. label)
(1)
Cable adapter (2 inch NPT) – (for Red Jacket Pumps)
*
– (1)
Plug (1/4 inch NPT)
*
– (2)
Wire Nuts (red) – (for connections at pump)
(1)
Warranty Registration Card (write / stick-on CU & LSU Serial No. labels)
(1)
TS-LLD Installation Guide Manual
(1)
Read Me First – Installation Guide (Supplement Sheet)
(1)
TS-LLD Quick Reference Guide (for the station owner / customer)
*
– Denotes parts in the supplied Hardware Kit (within plastic accessory bag)
Before you Begin
Refer to all applicable Local and State codes before beginning this installation. If a
conflict exists between the information presented in this manual, and the local
codes, then follow the local codes.
Maintenance, Service, and Installation of the TS-LLD system is to be performed by
Factory Trained and Certified personnel only.
Heed all CAUTIONS and
WARNINGS ! See Chapter 2.1 about Safety, before
attempting any installation, maintenance, or service work.
This manual is your reference guide for the INCON TS-LLD line leak detector. It
includes typical installation details, which may vary depending on the actual
equipment at the site. Reference the Submerged Turbine Pump (STP) or
submersible pump, and pump relay (Motor Control) box — manufacturers’
documentation — for the installation details and requirements of this equipment.
— ❖ —
NOTES
☞