13 fascia cover installation, 14 connection of office alarms, 15 power up and installation completion – GE Industrial Solutions Galaxy Power Systems User Manual
Page 8

Installation Guide for Galaxy Power Systems
4 - Table of Contents
Issue 12 August 2012
Connecting Cable Assembly to Thermal Probes
Monitoring a 210E Alarm Signal, BLJ-BIC7/8 with Millennium 12-13
Introduction 13-1
Installing the Fascia Covers
14 Connection of Office Alarms
Introduction 14-1
Connecting Controller Alarms
15 Power Up and Installation Completion
Initial System Checkout and Preparation for Power Up
Initial Power Up of the System
Installing Rectifiers and Converters
Setting the System Float Voltage
Setting the Low-Voltage Battery Disconnect Feature
Setting the Low-Voltage Load Disconnect Feature
Testing Rectifiers and Load Share
Testing Temperature Compensation (Optional Feature)
Testing the BD Alarm and High Voltage Shutdown
Galaxy Millennium Controller System Alarm Test
16 Addition or Modification to a Galaxy Power
Upgrading a GPS4848 System to a GPS4848/100 System
Adding an ED83143-31 Distribution Panel to a GPS
Installing an LVLD Contactor (if required)