GE Industrial Solutions Galaxy Power Systems User Manual
Page 15

Installation Guide for Galaxy Power Systems
Issue 12 August 2012
List of Figures - 5
Figure 10-2: Connection of Voltage, Shunt, Transducer,
Figure 10-3: Connection of Temperature Module
Figure 10-4: Connection of Control Relay Module
Figure 10-5: Connection to the Controller (All Modules)
Figure 10-6: RPM Module Assembly
Figure 11-1: Additional Battery Leads
Figure 11-2: H569-434 Battery Connection Panel Options
Figure 11-3: H569-436 Battery Connection Panel Options
Figure 11-4: H569-437 Battery Connection Panel Options
Figure 11-5: BJN Low Voltage Battery Disconnect
Contactor Control Board (Full-Height Cabinet)
Figure 11-6: BJN Low Voltage Battery Disconnect
Contactor Control Board (Half-Height Cabinet)
Figure 12-1: Thermal Probe Cable Assembly Connection
Figure 12-2: Thermal Probe Cable Assembly Connection
Figure 12-3: Wiring Schematic for Extender Cable
Figure 12-4: Thermal Probe and 210E Cable Routing
Figure 12-5: Thermal Probe Connection to BLJ Board
Figure 12-6: Thermal Probe Connection to Millennium
Figure 12-7: 210E Connection to Vector Controller or BLJ
Figure 12-8: 210E Connection to the Millennium Controller
Figure 12-9: Cable Assembly Connection to 210E
Figure 12-10: Cable Assembly Connection to Thermal Probes 12-12
Figure 12-11: Monitoring a 210E Alarm off the BLJ-BIC7/8 in a