GE Industrial Solutions Galaxy Power Systems User Manual
Page 14

Installation Guide for Galaxy Power Systems
4 - List of Figures
Issue 12 August 2012
Figure 8-1: Installation of Large Circuit Breakers
Figure 8-2: ED83143-31 Group 1 DC Distribution Panel
Figure 8-3: ED83143-31 Group 2 DC Distribution Panel
Figure 8-4: ED83143-31 Group 5 DC Distribution Panel
Figure 8-5: ED83143-31 Group 11 DC Distribution Panel
Figure 8-6: ED83143-31 Group 12 DC Distribution Panel
Figure 8-7: ED83143-31 Group 15 DC Distribution Panel
Figure 8-8: ED83143-31 Group 16 (14 position) and
Group 17 (22 position) DC Distribution Panels
Figure 8-9: ED83143-31 Group 21 DC Distribution Panel
Figure 8-10: ED83143-31 Group 22 DC Distribution Panel
Figure 8-11: ED83143-31 Group 53 DC Distribution Panel
Figure 8-12: ED83143-31 Group 54 (5 position) DC Distribution Panel
Figure 8-13: ED83143-31 Group 55 DC Distribution Panel
Figure 8-14: ED83143-31 Group 56 DC Distribution Panel
Figure 8-15: ED83143-31 Group 58 (6 positionGMT) DC Distribution
Figure 8-16: ED83143-31 Groups 71 and 171
Figure 8-17: EBV Circuit Pack for Load Disconnect
Figure 9-1: Converter Position
Figure 9-2: Installing a Second Carrier
Figure 9-3: Setting the CIC ID Switch
Figure 9-4: Converter Connection for System Ground
Figure 9-5: Connection Point for System Ground Wire
Figure 9-6: Installation of Load Circuit Breakers into 597A