beautypg.com

Centralized architecture, Dc power connections to central bus bar – GE Industrial Solutions Galaxy Power Systems User Manual

Page 70

background image

Installation Guide for Galaxy Power Systems

6 - 2 Centralized or Distributed Architecture Connections

Issue 12 August 2012

Centralized Architecture

Introduction

This section covers the field assembly for Centralized Architecture
(H569-434 G2). For Distributed Architecture (H569-434 G1, all
H569-437 Groups, and all H569-436 Groups), skip these procedures.

DC Power

Connections to

Central Bus Bar

Refer to Figure 6-1 for this procedure.

DC Power Connections to Central Bus Bar

Step

Action

1

Install optional plates if more than 8 connections are needed.
(See Figure 6-1.)

2

Run and connect new wires from positive and negative bus
bars in each cabinet to charge and charge return centralized
bus bars located outside the equipment.


Note: In centralized architectures all return wires from the
load must be terminated to the external discharge return bus.
These return wires may not be terminated in the cabinet.