beautypg.com

Closing the cover, Lft sealing, Operation – Ohaus I150-S Indicator User Manual

Page 48: Selecting a weighing unit

background image

48

Hole Plug

Closing the Cover

Closing the Cover

Closing the Cover

Closing the Cover

Closing the Cover

When all connections and settings have
been made, close the cover and fasten
the four cover clamps.

Insert a hole plug (included in accessory
kit) in each liquid tight connector seal
bushing which is not being used, and
tighten the bushing.

Seal

Wire

LFT SEALING

LFT SEALING

LFT SEALING

LFT SEALING

LFT SEALING

After the indicator and load receiver have
been evaluated and accepted by a weights
and measures official, the indicator must
be sealed as follows:

1.

Pass the calibration seal wire through
the small hole in the lip of the cover,
then through the clamp and bracket.

2.

Pass the end of the wire through the
lead seal.

3.

Seal the unit by squeezing the lead
seal over the wire.

OPERATION

OPERATION

OPERATION

OPERATION

OPERATION

Selecting a Weighing Unit

Selecting a Weighing Unit

Selecting a Weighing Unit

Selecting a Weighing Unit

Selecting a Weighing Unit

To select one of the available weighing
units for use,

repeatedly press

UNITS

until the desired

indicator appears on the display.

If the desired unit indicator does not ap-
pear, refer to “Unit Selection” in the
“SCALE SUBMENU” section.

SETUP

SETUP

SETUP

SETUP

SETUP

UNITS

UNITS

UNITS

UNITS

UNITS