Location, Grounding, Battery – Xantrex Technology SW Plus 4024 User Manual
Page 37: Wiring

Pre-Configuration Planning
976-0043-01-02
2–3
❐ Renewable energy systems (e.g., PV arrays, wind turbines etc.)
See
“System Input Requirements” on page 2–4
for more information.
Location
What are the safe, physical environmental requirements for your
installation:
❐ Mounting location for optimal performance and easy access of all
components
❐ Ventilation and clearance requirements for all components
❐ Mounting method (wall or shelf)
❐ Additional items/materials required for mounting
❐ RFI or EMI considerations
See
“Location Considerations” on page 2–5
for additional information.
Grounding
What methods of protection and grounding are required:
❐ Grounding type (i.e., ground bar, ground bus, or ground rod)
❐ Neutral-to-ground bonding requirements
❐ Lightning and surge protection
See
“Grounding Considerations” on page 2–7
for additional information.
Battery
What kind of DC storage will be used:
❐ Battery type and size
❐ Battery cables and sizes
❐ Size of the battery bank and it’s configuration
❐ Location of battery bank to rest of system
See
“Battery Considerations” on page 2–11
for additional information.
Wiring
What is needed/required for the AC and DC wiring for this installation:
❐ Types and sizes of wires needed
❐ Types and sizes of conduits needed
❐ Types and sizes of fuses, disconnects and/or circuit breakers
❐ Additional equipment for code compliance (e.g., service panels,
conduit boxes, emergency shutoff switches etc.)
❐ Wire routing
See
“Wiring Considerations” on page 2–18
for additional information.