beautypg.com

Preparing for installation and removal – NEC Express 5800/230Eh User Manual

Page 210

background image

9-4 Upgrading Your Server

PREPARING FOR INSTALLATION AND REMOVAL

Prepare the installation or removal of a component depending on the following procedure:

1.

Shut down the OS or press the POWER/SLEEP switch to turn off the power of the server.
(The POWER/SLEEP lamp goes off.)

2.

Pull out the power cord from the AC inlet on the server.

3.

Remove all the cables connected to the server on the rear panel.