IBM SCOD-3ZVQ5W User Manual
Page 474

466
COG
General rack placement rules and other information:
•
Locate heaviest components at the bottom of the rack (i.e., UPS, then servers or storage, etc.).
•
Do not extend more than one component on side rails at a time.
•
Maximum of three UPSs (including no more than two APC 5000 UPSs) per rack.
•
Utilize sidewall compartments for mounting PDUs and console switches prior to using EIA space.
•
When mounting components in a rack, consider user and service requirements.
•
When selecting length of power, console and storage cables, consider extension of cable management
arms and overall cable routing.
•
BTUs = Watts x 3.41.
Notes:
1.
Optional rack power cords: P/N 94G6667 - 14ft NEMA 5-15P; P/N 94G7448 - 14ft IEC 320-C14.
2.
Additional power cords are not required. This power supply option shares use of line cords provided
with the base system. Should be ordered in pairs to maintain redundancy.
3.
Refer to Appendix BladeCenter Power Upgrade Guidelines for important information that will help
determine when a BladeCenter power module upgrade is necessary.
Power Supply Options
Standard Power Cords
1
Power Supply
Part Number
Usable with
IEC 320-C13
IEC 320-C19
6ft NEM
A
5-15P
69
52301
9ft NEM
A
5-15P
69523
00
9ft IEC
320
-C14
36
L8886
Y-cable 2xC13/C14
25
R2567
9ft IEC
320
-C20
74
P4430
14ft IEC
320-C14
12J5995
8.2ft IEC 320-C20
00N7
701
8.
2ft NEMA 5-15P
12J51
12
370w
31P6133
x255
2
585w
90P5280
x336
1
625w
26K5097
x346
670w
26K9560
x236
1300w
13M7413
x366
1
2000w
26K4816
BladeCenter
3
2
DS300 Upgrade
13N1775
1701-1RL
1