TEST 3
-START - STOP SWITCH
Remove the 15 amp Fuse to disconn
ect the starting circuit. Then re
move
2
screws that retain the top
panel. Finally, remove the top
panel.
/^5
RESULTS: 1.) Switch tests Bad..
2.) Switch tests Good.
Set the switches of a Volt-Ohm-
Milliammeter to
and to ''Rxl"
scale. Connect meter test probes
together and ”Zero" the meter.
Connect the meter test.probes to
the switch center and lower termi
nals, as shown above. Meter needle
should not move. Hold Switch at
STA.RT position - meter needle
should, move upscale, to "zero”.
Hold switch at STOP - meter needle
should drop all the way downscale
to "Infinity”.
.......................Install a new switch
...................... Continue tests
Connect the VOM test probes to the
Switch terminals as shown at right.
Hold Start./Stop Switch at START -
meter needle should not move.
Release the Switch to NEUTRAL po
sition - the meter needle, should
not move.
Hold the Switch at STOP - the. meter
needle should swing upscale and. ind'
icate "zero" ohms.
RESULTS: 1.) Switch tests Bad..
2.) Switch tests Good.
.Install a new Sta.rt/Stop Switch
.Reconnect wires to Switch
Install top panel
Install 15 Amp Fuse
Continue Tests
4.2
Issued 3-78