beautypg.com

Hitachi J300U Series User Manual

Page 85

background image

10-4

Daily Inspection and Periodic Inspection (2/3)

Inspection cycle

Inspection
location

Inspection item

Inspection content

Inspection method

Criteria

Standard
replacement
period

Instruments

Main
circuit

Terminal board

No damage.

Visual inspection

No abnormalities.

Smoothing
capacitor

(1) Check for leaking

(2) Check for swelling

Visual inspection of
(1) and (2).

No abnormalities in (1) and
(2).

5 years
(Note 1)

Relays

(1) Check for stuttering noise
when operating

(1) Aural inspec-
tion.

(1) No abnormalities.

5 years

Regularly Periodic

Resistors

(1) Check for large cracks
or changes in color

(1) Visual inspection. (1) No abnormalities.

Cooling fan

(1) Check for abnormal
vibrations and noise

(2) Check for dust

(1) Rotate manually
with power off
and increase
tightening

(2) Visual inspection

(1) Smooth rotation

(2) No abnormality

2 - 3 years

___

___

___

___

___

___

___