beautypg.com

Create the control team – Grass Valley K2 Media Client System Guide Oct.10 2006 User Manual

Page 61

background image

September 7, 2006

K2 Media Client System Guide

61

Create the Control Team

Create the Control Team

The goal of teaming is to create two teams, one for the control network and one for
the FTP/streaming network. The teaming should be set up such that the first physical
port on the motherboard and the first physical port on the dual Ethernet adapter are
teamed for control. The second physical port on the motherboard and the second
physical port on the dual Ethernet adapter are teamed for FTP.

1. In Device Manager, right-click

…MT Dual Port Server Adapter

and select

Properties

.

The Properties dialog box opens.

2. Select the

Teaming

tab.

3. Select

Team with other adapters

, then click

New Team

. The New Team Wizard

opens.

4. Enter DO NOT USE.

You enter this name because there is a bug in the teaming software that creates a
“phantom” entry with this name, however that entry is not usable. Continue with
this procedure to work around the bug.

This manual is related to the following products: