Editing schedules – Grass Valley GV STRATUS Playout v.2.0 User Manual
Page 102

102
Working with Schedules
Editing schedules
Editing schedules
The Schedule Edit page is a three pane interface that allows you to build and edit
schedules. The left pane contains the list of existing schedules, which can be shown or
hidden by clicking the
button. The middle pane is a schedule grid in which you add or
edit the primary and secondary events. The right pane displays the details of an event
selected in the schedule grid.
Fig. 5-1: Example of the Schedule Edit page
The timecodes displayed in the Schedule Edit page are determined by the channel type
selected in the Channel Types list below the schedule grid. Schedules are not assigned a
channel type. The selected channel type is only used as a means to display the timecodes.
Although schedules are not assigned a timebase (frame rate), a schedule created or edited
in a particular timebase may produce unexpected results if viewed or played out in another
timebase. GV STRATUS Playout does not perform checks to ensure that the schedule, assets,
and channel are in the same timebase.
If a warning icon
appears in the schedule grid, it indicates an issue with the event. To
view the cause of the warning, hover your cursor over the warning icon. You can also click
Note:
Drop-frame timecodes use a semi-colon as a separator between the
seconds and the frames (01:00:00;00) while non-drop frame timecodes use a
colon (01:00:00:00) as a separator. Incorrect drop-frame timecodes are
automatically rounded up to the next valid drop-frame timecode value; for
example, 00:01:00;00 would be rounded up to 00:01:00;02.
Schedule Edit page
Schedule grid
tools for changing
the schedule
tools for changing
the events
Left pane
Event Details pane
(right pane)
timebase (frame rate)
is displayed according
to channel type
Warning
icons
Show/hide
button