beautypg.com

Loading sessions, Rebuilding sessions, 5 – projects – Teac HS-2000 User Manual

Page 43

background image

TASCAM HS-2000

43

5 – Projects

4. Touch the

MAKE SESSION

button.

5. When a confirmation pop-up appears, touch the

OK

button or press the DATA dial.

While a session is being created, a progress status

pop-up appears. When session creation completes, the

pop-up disappears.

NOTE

Immediately after creation, the new session becomes

the current (loaded) session.

On the

session selection screen, the icon

to the left

of the currently loaded session has the letter "C" and is

yellow.

Loading sessions

1. Press the PROJECT key on the front panel to open the

PROJECT

screen.

2. Touch the w button for the project that contains the

session that you want to load to open the session list.

If this project is not the current project, a pop-up

window appears confirming that you want to load it.

Touch the

OK

button.

3. Select the session that you want to load.
4. Touch the

MENU

button on the

SESSION

screen to

open a pull-up menu.

5. Touch the

LOAD

button in the pull-up menu.

6. When a confirmation pop-up appears, touch the

OK

button or press the DATA dial.

After loading completes, the Home Screen opens.

NOTE

On the session selection screen, the icon

to the left of

the currently loaded session has the letter "C" and is yellow.

Rebuilding sessions

You should rebuild a session whenever there is an

inconsistency between the unit's session management

file and the audio files. This can occur when an audio file

has been deleted from the unit via FTP, for example.

1. Press the PROJECT key on the front panel to open the

PROJECT

screen.

2. Touch the w button for the project that contains the

session that you want to rebuild to open the session

selection screen.

If the selected project is not the current project, a pop-

up window appears confirming that you want to load

it. Touch the

OK

button.

3. Select the session that you want to rebuild.

Touch the

MULTI SELECT

button to enable the

selection of multiple sessions.

4. Touch the

MENU

button on the session selection

screen to open a pull-up menu.

One session selected

Multiple sessions selected

5. Touch the

REBUILD

button in the pull-up menu.

6. When a confirmation pop-up appears, touch the

OK

button or press the DATA dial.

During rebuilding, a progress status pop-up appears.

When rebuilding completes, the pop-up disappears.

NOTE

You can also rebuild a session from that session’s take

selection screen.

If you do not select a session on the Session screen,

the entire current project will be rebuilt.