beautypg.com

Sw1-5 or jp5: hose pressurization, Sw1-6 or jp6: authorization, Jp7 (or sw1-7): electronic totalizers – Gasboy Atlas Fuel Systems Owner Manual User Manual

Page 27

background image

MDE-4363F Atlas™ Fuel Systems Owner’s Manual · September 2011

Page 23

CPU Switch Settings (Series 9800 Only Including DEF 9862 Units)

The Atlas Fuel System

SW1-5 or JP5: Hose Pressurization

If the Series 9800 program is configured for US Gallons, this dip switch setting is ignored and
the program will always act as if it is enabled. If the Series 9800 program is configured for
Liters or Imperial Gallons, this switch will control whether pump pressurization is enabled. If
a pump has been idle for more than ten minutes or this is the first use after start-up, a
maximum of 0.02 units of unrecorded volume will be pumped into the pump hydraulics during
the pump’s segment test.

SW1-6 or JP6: Authorization

This switch allows activation of the Series 9800 from some types of fuel management systems.
When the switch is closed, a 115 VAC (230 VAC international) signal must be present on the
AUTH/Control Feed line for pump activation to occur (required setting for Series 1000,
TopKAT mechanical, and all non-Gasboy systems). When open, the Series 9800 ignores the
AUTH/Control Feed line (normal setting for CFN, TopKAT top-mount, TopKAT electronic, or
no fuel system).

JP7 (or SW1-7): Electronic Totalizers

This switch must be open for normal operation. When closed, this switch enables the reset of
the electronic totalizers. For more information, refer to

“Commercial Electronic (Series 9800

Only)”

on

page 13

.

Pressurization SW1-5/JP5

Enable

Closed

Disable

Open

Authorization SW1-6/JP6

Fuel System

Yes

Closed

Series 1000
TopKAT mechanical
All Non-Gasboy systems

No

Open

CFN
TopKAT top-mount
TopKAT electronic
No fuel system

Totalizers

JP7 (or SW1-7)

Reset

Closed

Normal

Open