Site Preparation

The Atlas Fuel System

Guidelines in Atlas Fuel Systems Documentation and Other Codes

The following manuals provide guidelines for installing Atlas Fuel Systems
pumps/dispensers:

• MDE-4331 Atlas Fuel Systems Installation Manual
• MDE-4333 Atlas Fuel Systems Site Prep Manual
• FE-356 Atlas Pump and Dispenser Field Wiring
• FE-357 Atlas Pump Retail/Commercial Field Wiring
• FE-361 Atlas Master & Satellite Field Wiring Diagram

Ensure that the installer follows the instructions in the above listed manuals and adheres to all
applicable local, state, and national codes.

General Guidelines

Ensure that the installer, at a minimum, performs the following tasks:

• Attaches the hose breakaways.
• Follows all manufacturer installation instructions for devices attached to the dispenser,

such as hoses, nozzles, and shear valves.

• Installs a line leak detection system for all dispensers (The system must comply with all

local and state codes).

• Uses only UL-listed or approved attachments with the pump/dispenser.
• Installs shear valves for all dispensers and certain above ground tank pump applications

properly.

• Follows all codes.
• Bolts units to the island properly.
• Tests hoses for conductivity before use as per the manufacturer’s instructions.
• Uses appropriate safety signs as outlined in the manuals listed in

“Guidelines in Atlas Fuel

Systems Documentation and Other Codes”

.

• Uses isolation relays for dispensers (required by National Electrical Codes).
• Uses the recommended hose lengths for each unit unless you are using hose retrievers.

Note: This is not a complete list. For other requirements, refer to

“Guidelines in Atlas Fuel