Multiple probe system, Caution, Ii plus and ez welder system – user’s manual – Dukane DPC II Plus 9001:2000 User Manual
Page 32
22
Dukane Manual Part No. 403–566–01
DPC
™
II Plus and EZ Welder System – User’s Manual
Ꮨ
Ꮨ
ƽ
DUKANE CORP
ST. CHARLES, IL 60174
MADE IN USA
S E R I A L N U M B E R
U S 1 0 0 0 0
– WARNING! –
POWERLINE MUST BE GROUNDED
AT OUTLET
REMOVE ALL POWER BEFORE
REMOVING COVER OR CONNECTING
OR DISCONNECTING CABLES.
ULTRASOUND
OUTPUT
SYSTEM OUT
SYSTEM IN
J1
U. S . PAT E N T 4 , 2 7 7 , 7 1 0
– WARNING–
POWER LINE MUST BE
GROUNDED AT OUTLET
LINE VOLTAGE
200–240Vac 50/60Hz
15A
M O D E L N U M B E R
2 0 0 - 2 4 0 VAC, 5 0 - 6 0 H z , 1 5 A
Remote Ampltd
Control Mod.
Current Loop
Status
POS
NEG
SHLD
+
–
Power Monitor
Jacks
Power Signal
Output Module
Power
Signal
Output
Zero
Adjust
1
2
3
4
5
6
7
8
Earth Ground
#14 Gauge
Wire
110 VAC or
220 VAC
Grounding Lug
Grounding
Lug
Ultrasound
Input(s)
Automation
Control
Multi–Probe
Master Module
Ultrasonic Input
RG62B/U Coax
Status Output
P/N 200–1302
Coaxial Cable(s)
RG62B/U
#14 Gauge Wire
Automation
Equipment
P/N 200–1203
P/N 200–479
Ẅ
Ẅ
Ẅ
ẉ
Ẉ
ẇ
Ẇ
Ẇ
Ẇ
ẅ
ẅ
Figure 3-6 DPC II Plus Multiple Probe Conntroller Cable Connections
NOTE
The automated system cabling schematics in Fig-
ures 3–5, 3–6 and 3–7 are intended to represent
connections for a typical automation system. Your
system cabling may vary slightly from the diagrams.
CAUTION
To ensure safe and trouble–
free operation, ground the
DPC chassis and probe
mount as shown in Figures
3–4 to 3–7.
Use a STAR configuration
(illustrated below). Do not
DAISY CHAIN the grounds.
Ꮨ
Multiple Probe System
Step 1.
Ground the DPC II Plus chassis and
the probe support.
Step 2.
First attach a short coaxial cable from
the rear-panel DPC generator U/S
output J1 (see Figure 3–6) to the MPC
U/S input.
Step 3.
Attach another high voltage coax cable
from the rear MPC channel 1 probe
output to the first probe. Attach a
separate cable from each output
channel to each probe.
Step 4.
Connect the automation control cable
from the user–supplied automation
equipment to the System Input rear
panel HD-15 connector.
Step 5.
Attach the status output cable from the
user–supplied automation equipment to
the System Output DB-25 connector.
Step 6.
Attach the power cord to the DPC II
Plus and plug the other end into an
approved AC outlet.
Earth
Ground
#14 Gauge
Stranded or
Solid Wire
#14 Gauge
Stranded or
Solid Wire
Thruster or
Probe Mount
Grounding Lug
DPC Chassis
Grounding
Lug