Dukane Manual Part No. 403–566–01

Section 11 – DPC Checkout

Startup and Self–Test

1. Push the rear panel AC breaker switch to the

ON

position (see Figure 3–3 or 3–9 for the

switch location.)

2. Push the front panel AC power switch to the

ON position (marked I on the switch.) This is
labled A in Figure 11–1.

3. The

INPUT TEST

indicator in the Status Dis-

play (B) flashes red for 5 to 10 seconds. This
indicates the power-up self test is running.
When the test has successfully completed, the

INPUT TEST

indicator goes dark.

4. The green power indicator (C in Figure 11–1)

should then light up. The yellow

OFF LINE

sta-

tus indicator (D in Figure 11–1) should also
be lit. After subsequent power cycles, the DPC
will return to its last state (

ON LINE

or

OFF

LINE

) when the front panel AC power switch

is turned

ON

again.

5. Press the

ON LINE

generator control key on

the front panel (labeled E in Figure 11–1.) The
green

ON LINE

indicator in the Status Display

(labeled F in Figure 11–2) should now be lit.

NOTE

If the INPUT TEST indicator does not flash,
check the AC line input. Both the rear panel
and front panel AC breaker switches must be
in the ON position, and the DPC line cord must
be properly connected to a live AC outlet.

If the INPUT TEST indicator flashes and then
remains in a steady red state –

1. The AC line level may be out of speci-

fied operating range.

2. The DPC may have an inter nal

fault preventing normal opertion.

NOTE

If either of the AC Breakers open, they will flip
the switch to its Off position marked by the O.

STATUS

FAULT

ON LINE

INPUT TEST

OVERTEMP

OVERLOAD

OFF LINE

ON

LINE

TEST

OFF

LINE

0

20

40

60

80 100

PERCENTAGE OF AVAILABLE POWER

PERCENTAGE OF AVAILABLE POWER

SYSTEM POWER OUTPUT

NOTE

If a Press Control module is installed, and
the ON LINE and OFF LINE indicators do not
light, check the follwoing items.

1. A Press Base cable (P/N 200–1124) must

be connected to J35 on the press and
J902 on the DPC (Cable 3 in Figure 3–8).

2. The Emergency Stop switch must be in

its reset position (pulled out).

3. In place of a press cable, a jumper block

(Dukane P/N 200–1293) can be
installed on J902 (see Figure 3–4).

Figure 11–1

Front Panel Startup Controls and Indicators