Caution – Dukane DPC II Plus 9001:2000 User Manual
Page 122
112
Dukane Manual Part No. 403–566–01
DPC
™
II Plus and EZ Welder System – User’s Manual
The assembly and disassembly procedures for a
hand probe shown in Figure 10–6. The same pro-
cedure for a probe stack with booster is shown in
Figure 10–7. It makes no difference whether the
horn is attached to the booster first, or the booster
is attached to the probe first.
PROBE
HOUSING
BOOSTER
HORN
Ultrasound
Coaxial
Connector
Mounting Stud
Input End
Spanner
Wrench
Hole
Spanner
Wrench
Hole
(Typical)
Output End
(Threads Deeper
Than Input End)
Booster Input End
(Threads Shallower
Than Output End)
(Cap Screws Face
Toward Input)
Booster
Mounting
Ring
(Do not clamp)
Booster
Mounting
Ring
(Do not clamp)
Input End
Output End
Mounting Stud
(Insert Into Horn
First and Tighten
to Torque Specs)
(Insert Into Booster Input
End First and Tighten
to Torque Specs)
PROBE
STACK
ASSEMBLY
A
SSEMBLY
D
ISASSEMBLY
Figure 10–7
Probe Stack with Booster Assembly and Disassembly
ƽ
CAUTION
Never hold a probe by
the housing or a booster
by the mounting rings
when tightening or loos-
ening an adjoining com-
ponent. The probe
housing and booster
rings have anti–rotation
devices to keep the
transducer and booster
aligned and could shear
under excessive torque.