beautypg.com

Ь product inspection and storage, Li product inspection, 2 storage – Toshiba LF494 User Manual

Page 10: Toshiba

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

TOSHIBA

6 F 8 A 0 7 7 4

Ь Product Inspection and Storage

upon iirrival of the produt;i packiigc» open Ihc package and check the items contained inside.

If you do not intend ю install the product soon after opening the package, store Ihc product

and other related items in a place such as described in

1 , 2

below,

LI Product Inspection

The LF494/LF404 electromagnetic flowmeter is shipped in a cardboard container filled with

shock-absorbing materials. Open the package carefully and check as follows:

■ Make sure the following items arc included in the package.

(1) Model LF494/LK404 Electromagnetic Flowmeter*...,* i

(2) Instruction Manual.......... ........................................... |

■ Inspect the flowmeter for indications of damage that may have occurred during shipment.

■ Make sure the type and specifications of the flowmeter are in accordance with (he

ordered spccillcations.

If you cannot find the items listed above or any problem exists, contact your nearest

Toshiba representative.

1.2 Storage

To store the I.r494/LF404 flowmeter after opening the package, select a

storing place as follows and keep it under the conditions described below:

(1) Avoid places where there is direct sunlight, rain or wind.

(2) Store the product in a weli-vemilaicd place. Avoid places of extremely high

humidity or extremely higher low temperature. The following environment is
recommended:

* Humidity range: 10 to

90%

RH (no condensation)

• LStoruge temperature: -15 to +65* C

(3) Avoid places where vibratioiis or mechanical shock occur.

(4) Uo not leave the converter housing cover open . Open the cover only w'hen

you actually start wiring cables. I.eaving the cover open can cause gradual

deterioration of circuit isolation.

(i) To put the flowmieter temporarily on the floor, place it carefully

w i \ U

something

to support ii so that the flowmeter will not topple over

- 9 -

This manual is related to the following products: