beautypg.com

Dynojet 250iPX: Installation Guide User Manual

Page 74

background image

In Ground Model 200iPX/250iPX Motorcycle Dynamometer Installation Guide

C H A P T E R 2
Pit Covers Installation

2-52

4

Place the left side drum cover over the drum module.

5

Verify all the cables are routed under the left drum cover and through the cable
routing opening.

6

Loosely secure the left side drum cover using four 3/8-16 x 1/2-inch button-head
flange screws. Do not tighten.

Figure 2-42: Install the Left Side Drum Cover

PD136

cable routing opening

This manual is related to the following products: