beautypg.com

Dynojet 250iPX: Installation Guide User Manual

Page 161

background image

I N D E X

Version 2

In Ground Model 200iPX/250iPX Motorcycle Dynamometer Installation Guide

Index-iii

I

Industrial Noise Control, Inc. 1-4

inspection 5-7

installing power receptacle

50 Hz B-8

60 Hz B-3

intake air fan 1-4

interlocks 4-4

iPX drum module

connector plate 2-15

driveline assembly 2-14

driveline assembly set screws 2-15

installing 2-14

removing from the crate 2-12

woodruff key 2-14

J

junction box

installing 2-21

removing E-6

junction box cover

installing 2-58

removing E-2

L

layout, dyno pit room 2-29

left blower assembly

installing 2-22

removing E-6

left blower mount 2-20

left side drum cover 2-52

length 1-5

lifting eyes 2-9

loading the vehicle 5-2

M

main circuit breaker 3-2, 4-8

maintenance 5-10

making a run 5-9

manuals, finding on WinPEP cd 3-1

middle pit cover 2-53, 2-54

module uprights, aligning 2-16

monitor arms

installing 2-23

removing E-4

monitor support

installing 2-21

removing E-6

monitor tray

installing 2-23

removing E-4

P

PDA

see also power distribution assembly

pendant cable 2-33

phone, internet access 1-9

pickup card

installing 2-18

routing cable 2-41

wiring to breakout board 2-43

pit

dimensions 1-11

dyno drum module placement 2-8

pit covers

drum guard 2-56

drum guard bracket 2-51

drum guard mounting bracket 2-53

drum safety cover 2-57

eddy current brake 2-50

EEC finger guards 2-51

installing 2-50

left side drum cover 2-52

middle pit cover 2-53, 2-54

right pit cover 2-55

pit room layout 2-29

power

50 Hz B-7

60 Hz B-2

cable 2-39

connecting the dyno, 50 Hz B-11

connecting the dyno, 60 Hz B-6

hard wiring 60 Hz B-5

hard wiring, 50 Hz B-10

installation 50 Hz B-7

installation 60 Hz B-2

installing receptacle 60 Hz B-3

installing receptacle, 50 Hz B-8

replacing power plug 50 Hz B-10

replacing power plug 60 Hz B-5

requirements 50 Hz B-7

requirements 60 Hz B-2

testing voltages 50 Hz B-9

testing voltages 60 Hz B-4

verifying operation, 50 Hz B-11

verifying operation, 60 Hz B-6

power carriage 2-46

routing cables 2-38

testing 2-49

using 4-5

power distribution assembly 4-8

blower circuit breakers 4-8

fuses 4-11

main circuit breaker 4-8

troubleshooting 4-11

power line frequency D-2

power line voltage D-3

pre-run inspection 5-7

preventative maintenance 5-10

primary inductive pickup 5-6

This manual is related to the following products: