Routing Cables
Version 2
In Ground Model 200iPX/250iPX Motorcycle Dynamometer Installation Guide
2-39
R
OUTING
THE
E
DDY
C
URRENT
B
RAKE
, B
ATTERY
,
AND
D
YNO
P
OWER
C
ABLES
1
Route the eddy current brake cable (P/N 66952005) from the eddy current brake
through the designated power pit conduit and to the theta controller.
2
Route the battery cable (P/N 76950312) from the CPI through the same conduit
and over to the battery. Refer to the steps and Figure 2-32 on page 2-40 for
instructions on connecting the battery and starter cables.
Note: Be sure to keep the power and communications cables in different pit
conduits.
3
Route the temperature sensor cable from the eddy current brake through the
designated pit conduit and to the Breakout board, see Figure 2-35.
4
Route the dyno power cable from the CPI to your power source, but do not plug
it in yet.
Figure 2-31: Route the Eddy Current Brake, Battery, and Power Cables
PD125
battery cable
dyno power cable
CPI
eddy current
brake cable
battery
dyno
electronics
route power cables
in designated conduit
starter
theta
controller
temperature
sensor cable
starter cable