Metrohm 789 Robotic Sample Processor XL User Manual
Page 42

2.3 Data transmission connections
34
Metrohm Sample Processor, Installation
Start commands:
In principle these are the same commands as those given in the previ-
ous section.
Final scan:
In principle these are the same commands as those given in the previ-
ous section, with the addition of:
SCN:Rm : EndMeter
waits for end impulse from 781
SCN:Rm : ***11***
"
Sample Processor— 2 x Titrino/Titrandos
B
A
Titrino
C
D
B
A
Titrino
C
D
778
789
Control commands:
CTL:Rm : START Device1
starts Titrino/Titrando 1
CTL:Rm : *************1
"
CTL:Rm : START Device2
starts Titrino/Titrando 2
CTL:Rm : ********1*****
"
CTL:Rm : START Device*
starts both Titrino/Titrandos
CTL:Rm : ********1****1
"
Final scan:
SCN:Rm : End1
waits for end of titration Titrino/Titrando 1
SCN:Rm : ****1***
"
SCN:Rm : End2
waits for end of titration Titrino/Titrando 2
SCN:Rm : *1******
"
SCN:Rm : Ready1
waits until Titrino/Titrando 1 is ready
SCN:Rm : *******1
"
SCN:Rm : Ready2
waits until Titrino/Titrando 2 is ready
SCN:Rm : **1*****
"
SCN:Rm : Ready*
waits until both Titrino/Titrandos are ready
SCN:Rm : **1****1
"
The combined operation of the Titrino/Titrando/pH meter can also be
carried out without any problems by the same means.
Device 1
Device 2
Cable 6.2141.030