14.1

95-8533

4-10

Sequence of Events During a Configuration
Download

warning

the system is inactive and not executing logic/
alarm functions during a program download (in
both single and redundant controller
configurations).

When downloading a new configuration to the master

controller, the following sequence is executed:

1. The S3 software must be connected to the master

controller.

2. Alter the configuration and execute the download

command from S3.

3. The master controller goes into ‘Program’ mode

and passes mastership to the standby controller.

4. The updated configuration file is loaded into the

controller.

5. The controllers are automatically forced to switch

over.

6. The master controller puts the standby controller

into ‘Program’ mode and downloads the

configuration.

7. The controller indicates “Device Download Active”

until the LON devices have been successfully

updated.

8. The configuration download is now complete.

Manual Switchover
The user can request a manual switchover from an

externally wired switch. The request executes the

following sequence:

1. Verify that HSSL communication is good and there

are no internal faults in the standby controller.

2. Verify that the synchronization process is

complete.

3. The master requests the standby to take control.

4. The standby takes control and becomes the

master.

5. The controller indicates “Device Download Active”

until the LON devices have been successfully

updated.

Automatic Switchover
An automatic transfer will be initiated if the master

controller goes into an error (self detected internal

controller failure, program flow error in the controller,

user logic checksum error or application checksum

error). An automatic switchover executes the following

sequence:

1. Check that the standby controller is online by

verifying that HSSL communication is good and

there are no internal faults in the standby

controller.

2. Verify that the synchronization process is

complete.

3. The master requests the standby to take control.

4. The standby takes control and becomes the

master.

Replacing a Faulty Controller
If the master controller fails and the standby controller

is healthy, an automatic switchover will occur. To

replace the failed controller, perform the following

steps:

1. Remove power. Disconnect plugs and remove

the failed controller.

2. Mount the new controller.

3. Connect the LON to the new controller.

4. Connect the HSSL.

5. Connect any other I/O used.

6. Apply power to the controller.

7. A controller synchronization occurs and the new

controller is configured and indicates “Ready” as

the standby controller.

8. If preferred, perform a manual switchover to return

the primary controller to the master status.