beautypg.com

4 high voltage connections, 1 supply power – Pulsafeeder Pulsar DLC User Manual

Page 14

background image

9

5.4

High Voltage Connections

There are only three high voltage connections to be made on the DLC: supply power (J1), PULSAR
motor load (J3), and Alarm Relay Load (J2). Only the supply power and PULSAR motor load
connections are required. Refer to Figure 4 for connection location.

Figure 4 – High Voltage Connections

5.4.1 Supply Power

T

HE

DLC

REQUIRES ONE CONNECTION TO AN EXTERNAL POWER SOURCE

. I

T USES THIS SAME

CONNECTION TO POWER ITS OWN SUPPLY

,

THE SINGLE PHASE PUMP MOTOR

(

OR MOTOR STARTER

RELAY

)

AND THE ALARM RELAY OUTPUT

. Y

OU MUST TAKE THESE EXTERNAL LOADS INTO

CONSIDERATION WHEN SIZING THE BRANCH CIRCUIT

.

The DLC power supply and attached PULSAR motor are not fuse protected. You are responsible for
correctly sizing the protection element (i.e., fuse or circuit breaker at the distribution panel). Use the
work sheet on the next page for correctly sizing the branch protection element.