Installation, 1 location – Pulsafeeder Pulsar DLC User Manual
Page 10
5
5. Installation
5.1
Location
Review the Safety section prior to installing the DLC. It contains information required to properly
install and operate the DLC in an industrial environment.
The site selected for the installation of your DLC is largely dependent on that of the PULSAR metering
pump. Review the PULSAR Installation Operation Maintenance Instruction Manual (Bulletin No. PMP-
IOM-96) provided with your PULSAR metering pump. It details system related issues that are important
to proper operation of the PULSAR metering pump. Consider the following DLC related issues when
selecting a site. The DLC should be mounted in an area where the operator has access to the front of the
unit and a clear view of the display panel and keyboard. Avoid locations where the DLC would be
subjected to extreme cold or heat. Note the warning statement on the next page. The installation of this
device must comply with national, state and local codes.
Figure 1 – Typical Installation.