beautypg.com

Allied Telesis SwitchBlade x8106 User Manual

Page 207

background image

SwitchBlade x8106 Chassis Switch Installation Guide

207

2. Lift the locking hand on the power supply. Refer to Figure 138.

Figure 138. Lifting the Locking Handle on the Power Supply

3. Carefully pull on the locking handle to slide the power supply from the

chassis. Refer to Figure 139 on page 208.

Warning
The power supply is heavy. Use both hands to hold the module as
you remove it from the chassis.