beautypg.com

Post-installation procedures and information, Overview – Ag Leader GeoSteer Installation Manual User Manual

Page 55

background image

Hardware

Installation

Guide

45

9

Post-Installation Procedures and
Information

The Post-Installation Procedures and Information chapter provides information in the following sections:
Overview

Overview

After the installation has been completed, there are a number of procedures that may need to be performed prior to operating
the GeoSteer system. These can include the following:
• Create New Vehicle

• Hydraulic Leak Test

• Pressure Relief Valve Adjustment Procedure

• Calibration and Tuning Guidelines

Refer to the Post-Installation Procedures and Information chapter in the vehicle-specific
AutoSteer Installation Manual provided with the installation kit for information on which
procedures need to be performed and how to perform them.