1 device, 2 install communication device, 3 communication setting – Yokogawa EJX930A User Manual
Page 52: 4 connect the device to the power supply, 5 connect the device to the segment, Initial setting (f, Oundation, Fieldbus communication) -23, Device -23, Install communication device -23

<4. Preparation>
4-23
IM 01C25R51-01E
4.5 Initial Setting (F
OUNDATION
fieldbus
Communication)
NOTE
Regarding start up procedure of the device, refer to following:
EJX Multivariable Transmitter: User’s Manual IM01C25R01-01E “EJX910A and EJX930A
Multivariable Transmitters”
digitalYEWFLO Vortex Flowmeter: Appendix B-1
4.5.1 Device
Address and Tags (PD Tag and VFD Tag) must be set in the device.
IMPORTANT
Use function block scheduling and connection tool for DYFMVTool. After using these setting tool,
finish the program before starting FlowNavigator.
4.5.2 Install Communication Device
Install the Communication Device on PC.
4.5.3 Communication Setting
Refer to Appendix D-2 for Communication Device Setting.
4.5.4 Connect the Device to the power supply
(1) For EJX Multivariable Transmitter
Refer to User’s manual IM 01C25 R03-01E “EJX910A and EJX930A Fieldbus
Communication Type.”
(2) For digitalYEWFLO Vortex Flowmeter
Refer to User’s manual IM 01F06F00-01E “Model DY Vortex Flowmeter, Model DYA Vortex
Flow Converter, Fieldbus Communication Type”
4.5.5 Connect the Device to the Segment