Important – Yokogawa EJX930A User Manual
Page 152
B-5
IM 01C25R51-01E
Step 4 Set function block scheduling information
Arrange any function block shown in Table B2.1 or Table B2.2 on the "Function Block Application"
screen.
IMPORTANT
In “Case 2: AR Block is connected with other devices”, arrange digitalYEWFLO AR Block at the
end.
Otherwise, digitalYEWFLO will not carry out the flow calculation correctly.
FB0205E.ai
Drug & Drop
Figure B2.5 How to configure the function block scheduling
Double-click "Schedule" at the left of the screen to confirm the execution sequence of arranged
function blocks.
The figure below describes the sequence in “Case 2: AR Block is connected with other devices”.
FB0206E.ai
Figure B2.6 After double clicking “Schedule”
Proceed to < Step 6 > if there is no need to set the function block connection.