beautypg.com

10 leak test setup programming 10, Leak test menu (static tank) 10, 10 leak test setup programming – Franklin Fueling Systems Tank Sentinel (TS-1001, 2001, 504, & 508) Setup Programming Guide User Manual

Page 69: Leak test menu (static tank)

background image

Tank Leak Test Setup

Page

10 - 1

10

Press the

DOWN

key

10

Leak Test SETUP PROGRAMMING

Leak Test Menu (Static Tank)

H

U

MENU

×

Press this key and follow the

7

highlighted sequence below

See the Table of Contents to find topics in
this manual. See the Preface for general
information about this manual. And see
the Installation, Operator’s,
TroubleShooting Guides, and Application
Notes for other reference material.

Contents:
Tank Leak Test Menu

(Standard Static Test)

Output Group Assignments

Worksheet 10-1

Only the number of tanks that were programmed
under the SYSTEM menu will be displayed here
(Ø = No tank-related menus).

Static tank leak tests require 2 to 8 hours of
uninterrupted

quiet-time

to finish with no

dispensing, deliveries or line leak tests running
during the test.

Wait at least 2 hours after a dispense or line leak
test, and 6 hours after a delivery for valid test
results. The occurrence of any of these events
will cause the test to produce failed, or
indeterminate test results.

Before programming see State and Local
Regulations about leak testing (frequency,
minimum volume / capacity, and leak test
precision) and reporting requirements... adhere
to these requirements.

* Appears only if alarm on = yes (see
following page).

Begin programming with the CONFIDENCE
menu. Follow the sequences on the next
page.

LEAK TESTS

(MORE)

ALARM ON TST FL OG*

M1

M2

M3

M4

LEAK TESTS

(MORE)

CONFIDENCE PRECISION MIN LK TM

SCHEDULE

M1

M2

M3

M4

SETUP MENU

(MORE)

PRODUCTS MANIFOLDS* REPORTS

LK TESTS

M1

M2

M3

M4

SETUP MENU

(MORE)

EXIT

SYSTEM

TANKS

PROBES

SELECT MENU OPTION

SETUP

UPGRADE LANGUAGE

DATALOG

M1

M2

M3

M4

Press the

DOWN

key