IAI America CON-TG User Manual
Page 35

25
6.
Operation:
Mode
Flow
Chart
6.1
Initial Screen and TP Operation Mode Screen During Power - UP
When Teaching Pendant is connected to the controller, power is supplied to the Teaching
Pendant and operation starts.
In the case of a controller with a PORT switch, power will be supplied to the Teaching Pendant
and operation will start once power is supplied to the Teaching Pendant.
Upon power-on, the LCD display screen (hereinafte
r called the “screen”) displays the
Teaching Pendant software version as follows:
Initial Screen During Power – UP
This manual is related to the following products: