Operating Instructions Powador XP500/550-HV-TL
Page 17
Storage/Installation/Start-up
(1)
(2)
Figure 6: Transporting the unit at the installation location
5.3 Selecting the installation location
NOTE
The maximum flow rate of the cooling air is 6940m³ per hour.
Please keep this value in mind when you select the installation location.
Floor
•
Must have adequate load-bearing capacity
•
The building material must meet the requirements of building material class B1 (“Flame-resistant Building
Materials”, in accordance with DIN EN 13501-1)
Room
•
Should be as dry as possible
•
Must be indoors (IP21)
•
The installation location must be climate-controlled in order to dissipate the waste heat
•
Additional ventilation should be provided, if necessary
•
Do not install in a room where there is a risk of explosion
Clearance between walls and ceiling
•
Must be accessible for installation and maintenance
•
Air circulation may not be blocked
•
You do not have to provide for clearance on the sides or to the rear of the unit
•
Minimum clearance between unit and ceiling 60cm