4 datum setting (cycle 247, din/iso: g247), Effect, Please note before programming – HEIDENHAIN TNC 320 (34055x-06) Cycle programming User Manual
Page 226: Cycle parameters, Status displays, Datum setting (cycle 247, din/iso: g247)
Cycles: Coordinate Transformations
11.4
DATUM SETTING (Cycle 247, DIN/ISO: G247)
11
226
TNC 320 | User's Manual Cycle Programming | 5/2013
11.4
DATUM SETTING (Cycle 247, DIN/ISO:
G247)
Effect
With the DATUM SETTING cycle you can activate as the new
datum a preset defined in a preset table.
After a DATUM SETTING cycle definition, all of the coordinate
inputs and datum shifts (absolute and incremental) are referenced
to the new preset.
Status display
In the status display the TNC shows the active preset number
behind the datum symbol.
Please note before programming:
When activating a datum from the preset table,
the TNC resets the datum shift, mirroring, rotation,
scaling factor and axis-specific scaling factor.
If you activate preset number 0 (line 0), then you
activate the datum that you last set in a manual
operating mode.
Cycle 247 is not functional in Test Run mode.
Cycle parameters
Number for datum?: Enter the number of the
datum to be activated from the preset table. Input
range: 0 to 65535
NC blocks
13 CYCL DEF 247 DATUM SETTING
Q339=4
;DATUM NUMBER
Status displays
In the additional status display (POS. DISP. STATUS) the TNC shows
the active preset number behind the
datum dialog.