beautypg.com

Datum shift (cycle 7) – HEIDENHAIN TNC 360 User Manual User Manual

Page 184

background image

8-31

TNC 360

8

Cycles

Fig. 8.36:

Activation of the datum shift

Fig. 8.37: Datum shift, absolute

Fig. 8.38: Datum shift, incremental

8.4

Cycles for Coordinate Transformations

X

Y

Z

Y

X

Z

Y

X

Z

IX

IY

Y

X

Z

X

Y

DATUM SHIFT (Cycle 7)

Application

With the aid of a datum shift, machining operations can be repeated at
various locations on the workpiece.

Activation

When the DATUM SHIFT cycle has been defined, all coordinate data are
based on the new datum. Shifted axes are identified in the status display
by the letter N.

Input data

Only the coordinates of the new datum need to be entered. Absolute
values are based on the workpiece datum manually defined with datum
setting. Incremental values are based on the last valid datum; this datum
can itself be shifted.

Cancellation

To cancel a datum shift, enter the datum shift coordinates X = 0, Y = 0
and Z = 0.

When combining transformations, program the datum shift first.