Preventive maintenance, Reventive, Aintenance – RLE LD2100 V.2.6 User Manual
Page 81

rletech.com
LD2100 User Guide
81
C
H A P T E R
C
HAPTER
5
P
REVENTIVE
M
AINTENANCE
Follow these steps monthly to test the system and ensure that the control panel is functioning
properly:
1
Place water on the cable.
2
Verify the Leak Detected alarm on the control panel.
3
Compare the distance reading on the LD2100 to a reference map (if available) to verify that
the LD2100 displays the correct leak location. See
information about calibrating the leak detection cable.
4
Dry the cable and verify that the LD2100 returns to normal.
5
Remove the End-of-Line terminator (EOL).
6
Verify the Cable Break alarm on the control panel.
7
Reinstall the EOL.
8
Verify that the LD2100 returns to normal.
9
Monitor the cable current monthly to verify that the cable is not being contaminated. The
LD2100 will alarm on cable contamination if the contamination is excessive.
10
From the LD2100 Web interface, verify that the Cable Current is less than 25
μA. If the cable
current is greater than 25
μA, troubleshoot the cables to determine which cable is
contaminated. The contaminated cable should be removed, cleaned, and retested.