Installation, Prepare for installation, Nstallation – RLE LD2100 V.2.6 User Manual
Page 13

rletech.com
LD2100 User Guide
13
C
H A P T E R
C
HAPTER
1
I
NSTALLATION
Installing the LD2100 involves mounting it to a wall in the appropriate location and making
the necessary connections for power, leak detection, and communications.
2.1.
Prepare for Installation
Before installing the LD2100, have the following supplies available:
Included with the LD2100
♦
Wall mount kit (or purchase optional enclosure, LD-ENC)
♦
Cross-over cable (blue with yellow ends)
♦
15ft. (4.57m) leader cable
♦
End-of-line terminator (EOL)
Available from RLE, Sold Separately
♦
SeaHawk sensing cable
♦
Non-sensing cable, other accessories
♦
24VAC power supply (part #WA-AC-24-ST) or 24VDC power supply (part
#PSWA-DC-24)
Information Required
Consult with your IT administrator to determine the following network settings for the
LD2100:
♦
IP address
♦
Subnet mask
♦
Default gateway