Test the system – RLE LD2100 V.2.6 User Manual

Page 25

background image

rletech.com

LD2100 User Guide

25

2

Installation

2.10.

Test the System

Now that the system is calibrated, test a few spots before mapping the system.

Note

If the LD2100 is already connected to a BMS or NMS, notify monitoring personnel before you

begin testing the system.

1

To verify the LD2100’s accuracy, test three points within the length of sensing cable - one

at the beginning, one in the middle of the length, and another near the end of the length of

cable.

There are a variety of ways to simulate a leak:

2

Verify that the LD2100 reports the leaks within a few feet of their actual physical location.

3

Remove the simulated leak source and return the system to its normal operating state.

Pour a small puddle of water on the

cable while it rests on the floor.

Dunk the cable in a cup of water.

Soak a paper towel or rag and wrap it

loosely around the cable. This is

popular if the cable is used in pipe

applications. Be careful to wrap the

wet cloth loosely around the cable.

Do not put pressure on the cable.

IMPORTANT - To avoid inaccurate

readings, do not grip the cable with

your hand.

Figure 2.8

Apply Moisture to the Cable for Testing Purposes