Powermax, Power supply component replacement 9-62, 105 service manual – Hypertherm Powermax105 Service Manual User Manual
Page 260

Power SuPPly ComPonent rePlaCement
9-62
powermax
105 Service Manual
8. Align and push the new solenoid valve onto the short gas tube until fully seated.
9. Secure the solenoid valve to the center panel by tightening the two supplied mounting screws to 23 kg cm
(20 in.-lbs).
10. Push the long gas tube into the solenoid valve until fully seated.
11. Push the pressure transducer into the solenoid valve until fully seated.
12. Route the solenoid valve power wires and connector through the grommet.
13. Plug the solenoid valve connector into the J6 header of the power board.
J1
J2
J3
J5
J6
J1
J2
J3
J5
J6
Short gas
tube fitting
Mounting screws
Long gas
tube fitting
Long gas tube
Short gas tube
Solenoid valve
Solenoid valve
power wires
Pressure
transducer fitting
Pressure transducer
Grommet