Powermax – Hypertherm Powermax105 Service Manual User Manual
Page 222

Power SuPPly ComPonent rePlaCement
9-24
powermax
105 Service Manual
3. Route the CPC port and attached cables above the solenoid valve and over to the CPC port opening on the rear
panel of the power supply.
4. Insert the CPC port into the CPC port opening from inside the power supply. Be sure to position the port with the
green/yellow ground wire at the bottom of the port.
5. Secure the CPC port by tightening two of the supplied screws to 11.5 kg cm (10 in.-lbs). Two screws are sufficient
when inserted in opposite corners of the CPC port.
6. Secure the green/yellow ground wire (from the CPC port) to the gas filter housing, using the same screw that
secures the large ground wire from the center panel. Tighten the ground wire screw to 17.3 kg cm (15 in.-lbs).
Ground wire screw
Solenoid valve
CPC Port