beautypg.com

Powermax, Troubleshooting and system tests – Hypertherm Powermax105 Service Manual User Manual

Page 149

background image

TroubleshooTing and sysTem TesTs

powermax

105 Service Manual

8-11

J27

WORK

LEAD

J26

RED

J18

ORG

J17

J32

J28

RED

Measure resistance from

All models

Work lead (J27) to nozzle (black wire)

230 kΩ

Work lead (J27) to electrode (red wire)

9 kΩ

Electrode (red wire) to nozzle (black wire)

230 kΩ

Output to ground

> 20 MΩ

If no problems were found during the visual inspection or the initial resistance check, and the power supply still does not

operate correctly, see the Troubleshooting guide.

Note: Troubleshooting guide later is this section provides most probable causes and solutions. Study the system

wiring diagram and understand the theory of operation before troubleshooting. Before purchasing any major

replacement component, verify the problem with Hypertherm Technical Service or the nearest Hypertherm

repair facility.

Black wires

Red wire J28

Work lead J27

This manual is related to the following products: