beautypg.com

Node manager operational capabilities change, Next steps, Next – Kontron S4600 SEL Troubleshooting User Manual

Page 131: Steps

background image

System Event Log Troubleshooting Guide for EPSD

Platforms Based on Intel

®

Xeon

®

Processor E5 4600/2600/2400/1600/1400 Product Families

Manageability Engine (ME) Events

Revision 1.1

Intel order number G90620-002

121

13.4.1

Node Manager Operational Capabilities Change – Next Steps

Policy Interface available indicates that Intel

®

Intelligent Power Node Manager is able to respond to the external interface about

querying and setting Intel

®

Intelligent Power Node Manager policies. This is generally available as soon as the microcontroller is

initialized.

Monitoring Interface available indicates that Intel

®

Intelligent Power Node Manager has the capability to monitor power and

temperature. This is generally available when firmware is operational.

Power limiting interface available indicates that Intel

®

Intelligent Power Node Manager can do power limiting and is indicative of an

ACPI-compliant OS loaded (unless the OEM has indicated support for non-ACPI compliant OS).

Current value of not acknowledged capability sensor will be retransmitted no faster than every 300 milliseconds.

Next steps depend on the policy that was set. See the Node Manager Specification for more details.

This manual is related to the following products: