Suspending the scheduler, Running the scheduler on demand – SATEC PM130 PLUS Manual User Manual
Page 124

Chapter 8 Retrieving
A N D S T O R I N G F I L E S
Using
T H E U P L O A D S C H E D U L E R
124
PM130 PLUS Powermeter Series
5. Select a daily, weekly or monthly schedule, and adjust the
start time. If you wish to upload data periodically in predefined
intervals, click on Periodic and define the time period in hours
and minutes.
6. Select the number of attempts to upload data in the event of
temporary communication problems or unavailability of your
device, and the delay between attempts in minutes and
seconds.
7. If you wish to use the schedule to synchronize the device clock
with your PC, check the RTC Synchronization Enable box. If
your device is password protected by a communications
password, type in the password you set in the device to allow
PAS to update the clock.
8. Click on the Select Logs button, check the boxes for logs you
want to upload on a schedule, and then click OK.
9. Check the Enabled box at left to activate a schedule for the
device.
10. Click Close to store your schedule.
To keep the Upload Scheduler running, the On-line button
on the PAS
toolbar must be checked all the time. If you uncheck it, the scheduler
stops operations. This does not cause loss of data, since the scheduler will
resume operations when you check this button again.
Suspending the Scheduler
To suspend the Upload Scheduler, check the Suspend Scheduler box at
right. To activate the Upload Scheduler, leave this box unchecked.
Running the Scheduler on Demand
You can run the scheduler at any time outside the schedule by checking
the Start Now box at right. This is a one-time action. After uploading is
completed, the Upload Scheduler un-checks this box automatically.