beautypg.com

Brocade FastIron Ethernet Switch Stacking Configuration Guide User Manual

Page 40

background image

Error! port 3/4/1 is invalid

device(config-unit-3)# stack-port 3/2/1

To return both ports to stacking status, enter the no stack-port command on the single stacking port.
This converts both ports to stacking ports. By default, if both ports are stacking ports, they are
displayed by the system only when stacking is enabled. If only one port is configured as a stacking
port, the system always displays this port.

Using secure-setup to build an FCX traditional stack

You can use the secure-setup utility to build an FCX traditional stack by performing the following step.

Enter stack enable and stack secure-setup commands when you have designated the desired
stacking ports and connected your FCX units together, on stack unit 1, as shown in the following
output.

device# stack enable

device# stack secure-setup

device# Discovering the stack topology...

Available UPSTREAM units

Hop(s) Id Type MAC Address

1 new FCX648POE 0000.00d6.0511

2 new FCX624 0000.0099.0000

Enter the number of the desired UPSTREAM units (0-2)[0]: 2

Selected Topology:

Active Id Type MAC Address

1 FCX624POE 0000.00e5.0100

Selected UPSTREAM units

Hop(s) Id Type MAC Address

1 2 FCX648POE 0000.00d6.0511

2 3 FCX624 0000.0099.0000

Do you accept the unit ids (y/n)?: y

device# Election, was alone --> active, assigned-ID=1, total 3 units, my priority=128

Election, was active, no role change, assigned-ID=1, total 3 units, my priority=128

reset unit 2: diff bootup id=1

reset unit 3: diff bootup id=1

Election, was alone --> active, assigned-ID=1, total 3 units, my priority=128

Detect stack member 2 POE capable

Detect stack unit 2 has different startup config flash, will synchronize it

Detect stack unit 3 has different startup config flash, will synchronize it

Done hot swap: Set stack unit 3 to Ready

Done hot swap: Set stack unit 2 to Ready

Synchronize startup config to stack unit 2

Flash Memory Write (8192 bytes per dot).Synchronize startup config to stack unit 3

Flash Memory Write (8192 bytes per dot).POE: Stack unit 2 Power supply 1 with 4

10000 mwatts capacity is up

Stack unit 2 Power supply 2 is down

Stack unit 3 Power supply 1 is up

Stack unit 3 Power supply 2 is down

Config changed due to add/del units. Do write mem if you want to keep it

Election, was active, no role change, assigned-ID=1, total 3 units, my priority=128

device#

Config changed due to add/del units. Do write mem if you want to keep it

device# PoE Info: PoE module 1 of Unit 2 on ports 2/1/1 to 2/1/48 detected.

Initializing....

PoE Info: PoE module 1 of Unit 2 initialization is done.

device# show stack

alone: standalone, D: dynamic config, S: static config

ID Type Role MAC Address Pri State Comment

1 S FCX624POE active 0000.00e5.0100

128 local Ready

2 D FCX648POE standby

0000.00d6.0511 0 remote Ready

3 D FCX624 member

0000.0099.0000 0 remote Ready

standby active

+---+ +---+ +---+

| 3 |3/1--3/1| 2 |2/1--2/1| 1 |

+---+ +---+ +---+

Current stack management MAC is 0000.00e5.0100

device# write mem

Write startup-config done.

Flash Memory Write (8192 bytes per dot) .Flash to Flash Done.

Using secure-setup to build an FCX traditional stack

38

FastIron Ethernet Switch Stacking Configuration Guide

53-1003090-02