Change history – IAI America SSPDACR User Manual
Page 113
Change History
105
Change History
Revision Date
Description of Revision
July 2011
October 2011
November 2011
March 2012
March 2012
May 2012
January 2013
First edition
Second edition
A page for CE Marking added
Third edition
Contents changed in Safety Guide
Caution notes added for when working with two or more persons
SSPDACR-S and M added
Pg. 37
The description “there is no rust-proof treatment conducted” was deleted since
SSPDACR is treated with rust-proof process in standard.
Fourth edition
Pg. 31, 37
ISDB, ISPDB, ISDBCR and ISPDBCR
Note changed to 1.8 times more of the nominal diameter for the length of thread
engagement
Pg. 59
“This is an option limited to the high-precision specifications
(ISPDB/ISPDBCR/SSPDACR).” deleted
Note added to tell the straightness is 0.025mm for all with stroke 500mm or less
unless the model is the high-precision specifications one.
Fifth edition
Pg. 1 to 7
Contents added and changed in Safety Guide
Pg. 8
Note “Make sure to attach the actuator properly by following this operation manual.”
added in Caution in Handling
Pg. 68
Warning notes added such as in case the grease got into your eye, immediately go
to see the doctor for an appropriate care.
Pg. 90 to 102
Weight added to external dimensions
Sixth edition
Pg. 31 to 34
Description regarding through holes for SSPDACR deleted because they are lidded
to keep the cleanliness
Seventh edition
Pg. 44
Correction made to some area in items to be prohibited in handling of cables
Pg. 45
Calculation formula added for when commanded acceleration speed is higher than
rated acceleration speed